Roof assembly is progressing rapidly on our construction site. The trapezoidal sheets are currently being fitted precisely with the help of a crane, successfully completing a key construction phase.
After completion of the supporting structure, the side walls of Hall 1 were installed in the next construction phase. At the same time, the basic pipes for the waste water in this area were completed.
The load-bearing supports were professionally installed. The main and secondary roof beams were then installed, completing the primary construction of Hall 1 on schedule.
The construction of the warehouse began with the erection of the concrete firewall. This is a concrete cavity wall, which was prefabricated in the precast plant with inner and outer shells and filled with in-situ concrete. Each element is 8.20 m high, 2.50 m wide and weighs around seven tonnes.
The earthworks have been successfully completed. Now that the foundations have been laid, the actual construction of the warehouse can begin.
The demolition of the old buildings has been successfully completed and the earthworks are in full swing.